Industrial Automation Glossary – S

Written by Neal Babcock  

safety margin
a factor of safety between calculated maximums and rated maximums.

SCADA (Supervisory Control And Data Acquisition)
computer remote monitoring and control of processes.

scan time
the time it takes a PLC read all the inputs, execute the logic and write to all the outputs.

schematic
an abstract drawing showing components in a design as simple figures. The figures drawn are often the essential functional elements that must be considered in engineering calculations. Read more

Industrial Automation Glossary – T, U, V, W, X, Y, Z

Written by Neal Babcock  

T1
a 1.54 Mbps network data link.

T3
a 45 Mbps network data link. This can be done with parallel T1 lines and packet switching.

tap
a connection to a power line.

tare
the ratio between unloaded and loaded weights. Read more

« Previous Page